New construction roofs, built right the first time

New builds, additions, ADUs, garages, and shops all need a first roof that never becomes a problem. We work from your plans, coordinate with your builder's schedule, and install to manufacturer spec so the warranty means what it says.

New roof installation at the underlayment stage
How it works

From plans to final inspection

1Plan review & quoteWe quote from your drawings: pitch, materials, ventilation, and code requirements.
2Schedule with your builderWe slot into the construction timeline and show up when the framing is ready.
3Dry-inUnderlayment and flashing installed promptly so interior trades can keep moving.
4Final roofingShingles or the specified system installed to manufacturer spec, ventilation included.
5Inspection & handoffCity final passed, warranty registered, and documentation handed to you or your builder.
Projects

Projects we roof

  • New custom homes and spec builds
  • Room additions tied into an existing roofline
  • ADUs and granny flats, attached or detached
  • Detached garages, shops, and outbuildings
  • Patio covers and porch roofs done to code
Tying into an existing roof?Additions live or die at the tie-in. We flash and weave new roof into old so the seam never becomes the leak.
Worth knowing

Why the first roof matters most

Warranty from day oneSpec-correct installation registers the full manufacturer warranty on a brand-new home.
Ventilation done rightCorrect intake and exhaust from the start decides how fast every future roof ages.
On-schedule dry-inBuilders wait on roofers. We hit dry-in dates so the rest of the project keeps moving.
Code and Title 24Cool-roof requirements and local code handled in the quote, not discovered at inspection.
Clean tie-insAdditions woven into existing roofs so the joint is invisible and watertight.
One local contactThe roofer quoting your plans is the roofer on the deck. Questions get answered fast.
Building this year? send the plans, we'll quote it this week.
Systems

Systems we install on new construction

Architectural shingleThe default for Valley homes: dimensional look, strong warranties, and the best value per year.Most popular
Cool-roof rated shingleTitle 24 compliant reflective shingle, often required on new Valley construction anyway.Code ready
Flat & low-slope systemsTorch-down and rolled systems for modern low-pitch designs, patio covers, and ADUs.For low-pitch plans
Our work

New installs in progress

Underlayment and dry-in on a new roof
Dry-in day: underlayment down on schedule · Delhi
Crew installing shingles on new construction
Field shingles going down · Modesto
Completed new roof installation
Finished install, warranty registered · Ripon

New installation questions

Do you work directly with builders and GCs?

Yes, most of our new-construction work comes through builders. We quote from plans, hold our dates, and keep the site clean. Homeowners building their own ADU or shop are just as welcome.

Can you match the roof on my existing house?

For additions and ADUs, yes, that's usually the goal. We'll match shingle profile and color as closely as current product lines allow and show you samples before ordering.

How far ahead should we book?

A few weeks of lead time is ideal so we can hold your dry-in date, but call regardless of where your build is. We can usually make a schedule work.

Roofing a new build? Let's talk plans.

Send the drawings or just call. You'll get a spec-level quote and dates we actually hold.